| Project: Dallas Contracting Co., Inc. Completes Selective Demolition and Salvage Project |
List All Projects |
|
|
|
|
|
|
| Category: |
Demolition, Rigging, Dismantlement |
|
|
|
Dallas Contracting Co., Inc., (website: http://www.dallascontracting.com) a specialized demolition company providing demolition contractor services, onsite concrete aggregate crushing and scrap metal recycling to various industries, recently completed the selective demolition of a pilot plant at an active chemical manufacturing facility in New Jersey.
National Demolition Association member Dallas Contracting Co., Inc. (Dallas Contracting) was contracted by a leading global producer of value-added industrial chemicals to perform selective interior and exterior demolition of structures and equipment associated with their pilot plant. The pilot plant was being shut down and the client wanted certain equipment rigged and crated and the remaining equipment and associated structures demolished.
Prior to any dismantlement work, Dallas Contracting confirmed that all utilities had been disconnected and that all process lines had been properly drained.
Dallas Contracting then commenced the salvage and rigging of various pieces of equipment which needed to be relocated to the clients other facilities (one in the U.S. and one in Europe). In total, Dallas Contracting rigged and crated over 25 pieces of equipment (pumps, motors, meters, PLCs) which necessitated 21 crates.
Following the salvage operation, Dallas Contracting then commenced the selective demolition work, including:
Disconnection and Removal of Pilot Apparatuses in Lab
Disconnection and Removal of Equipment in Compressor Closet
Disconnection and Removal of Exterior Tank and Cylinder Housing
Disconnection and Removal of Control Panels in Control Room
Disconnection and Removal of Apparatuses on Mezzanine
Demolition of Service Piping in Lab and Compressor Closet
Demolition of Exterior Chain Link Fencing
Demolition of 500 Gallon Stainless Steel Storage Tank
Demolition of Miscellaneous Exterior Components
Dallas Contracting also performed the necessary restorative work such as repair of thru-wall pipe penetrations, ceiling repair, asphalt walkway and driveway re-finishing, and concrete slab repairs.
The project was completed in approximately 3 weeks without incident or injury. |
|
|